PowerPRO3600
HITEC · DRUPS

HITEC PowerPRO3600

PowerPRO3600 combines no-break UPS, kinetic energy storage and standby generation in one system. With up to 3600 kVA per machine the whole facility – including mechanical and motor loads – can be supplied with fewer machines.

2500 / 2850 / 3000 kVA @ 400 V 50 Hzpower 50 hz
2500 / 2850 / 3600 kVA @ 480 V 60 Hzpower 60 hz
Up to 97 %efficiency
Dynamic output voltage ≤ 15 %dynamics
  • Large data centres and industrial plants
  • Sites where 100 % of the load must be no-break
  • Space-constrained projects (HITEC states 40–60 % less space than static UPS)
Price on requestRange: 2500–3000 kVA (50 Hz) / 2500–3600 kVA (60 Hz)

Technical data

ManufacturerHITEC
TypeDRUPS
Power 50 Hz2500 / 2850 / 3000 kVA @ 400 V 50 Hz
Power 60 Hz2500 / 2850 / 3600 kVA @ 480 V 60 Hz
EfficiencyUp to 97 %
DynamicsDynamic output voltage ≤ 15 %
Ambient5–40 °C, max 85 % RH
Weight / size28–38.6 t, length 10.8–12.0 m

Source: hitec-ups.com; hitec-ups.com.

Technology

How it works

The energy store has two elements: an Energy Transfer Module (ETM) spinning with the generator at 1500 rpm (50 Hz), and a low-speed flywheel at about 2900 rpm. According to HITEC the lower speed allows extended maintenance intervals.

Energy Storage Optimization (ESO) reduces flywheel speed during extended partial load and restores it as load increases. Diesel Start Delay (DSD) prevents unnecessary engine starts.

The modules can work independently: engine and generator can run as a conventional genset with storage disconnected, and generator, ETM and flywheel can run as a rotary UPS while the engine is in maintenance.

PowerPRO3600

Application

Where it fits

  • Large data centres and industrial plants
  • Sites where 100 % of the load must be no-break
  • Space-constrained projects (HITEC states 40–60 % less space than static UPS)

Versions and options

  • Low and medium voltage
  • Project-specific solutions
  • Emission-optimised engines (EPA/TA-Luft)
PowerPRO3600

Service

Operation and maintenance

The free-wheel clutch is self-lubricating and low-maintenance, and there are no batteries to replace every 3–5 years. HITEC offers remote monitoring and a 24/7 helpdesk.

A rotary plant should always be load-tested at commissioning – stepped load, utility failures and transfer to engine.

Load bank test

Other models from HITEC

Read more at Bluecircle

Norwerk’s partner Bluecircle has in-depth pages on the topic.

Do you have a project or a system that needs service?

Send us the load, required autonomy and voltage level – or describe the task. We will come back with a solution sized for your operation.