Norwerk · emergency power and critical supply

When the grid fails, operations carry on.

We supply, test and service rotary UPS, UPS systems, generator plants and emergency power systems for critical operations – with emergency service around the clock, all year.

What can we help you with?

From the plan to the plant and the operation afterwards – choose what fits your situation.

  1. 01Contingency plan
  2. 02Rotary UPS / DRUPS
  3. 03UPS systems
  4. 04Static transfer switch
  5. 05Generator plants
  6. 06Emergency power systems
  7. 07Fuel cells
  8. 08Compliance / ISO 9001
  9. 09Commissioning
  10. 10Service
  11. 11Thermography
  12. 12Server room cleaning

Contingency

Emergency power is only as good as the plan behind it.

The contingency plan sets out which functions must keep running, for how long, and who does what. Only when that is decided can the emergency power system be sized: autonomy, redundancy and which loads must be supplied.

Our partner Bluecircle prepares and reviews contingency plans based on the technical supply.

Contingency planning at Bluecircle
Engineer reviewing an emergency power system on a tablet
ORGANISATIONEMERGENCY POWERManagement and planAutonomyHow long?Critical functionsPrioritised loadsWhat must not stop?IT and operationsRedundancyWhat if something fails?
ORGANISATIONPOWERManagement andplanAutonomyHow long?CriticalfunctionsPrioritised loadsWhat must not stop?IT and operationsRedundancyWhat if something fails?
The organisation’s answers determine how the plant is built.

Rotary UPS / DRUPS

UPS without batteries – standby power built in.

A DRUPS combines UPS, kinetic energy storage and diesel engine in one machine. The flywheel bridges the gap until the engine has taken over.
All about rotary UPS

NEW · HITEC

HITEC PowerPRO3 – new generation DRUPS

New kinetic energy module with 25 % more energy, Cummins G-Drive engine and certified for 100 % HVO. Succeeds the PowerPRO2700 in the same footprint.

3000 kVAno-break at 60 Hz
97 %efficiency
35 kVup to medium voltage
See PowerPRO3

UPS systems

Power without interruption – from rack to data centre.

An online UPS converts the power twice, so the load is always supplied from the inverter – including the moment the grid drops out. The batteries carry the load until the grid returns or the generator has taken over.

Borri Ingenio MaxBorri Ingenio Max3-phase · 200–600 kVAOnline double conversionNo transfer timeThe full Borri range1-phase, 3-phase, industrial UPS and STS

Static transfer switch · Borri STS 300

Two sources, one load – transfer in at most 4 ms.

A static transfer switch gives equipment with one power supply access to two independent sources. Borri STS 300 transfers with thyristors in at most 4 ms – and inhibits the transfer if the fault is in the load, so the healthy source is not hit.

  • ≤ 4 mstransfer time
  • 100–2000 A3-phase, 3- or 4-pole
  • > 99 %efficiency
Borri STS 300 static transfer switch
Source 1UPS ASource 2UPS B or mainsSTSLoadSingle-corded equipmentINHIBITED≤ 4 ms
Source 1UPS ASource 2UPS B or mainsSTSLoadSingle-corded equipmentINHIBITED≤ 4 ms

The load is supplied from the preferred source. The STS monitors voltage and frequency on both sources at all times.

Generator plants

The long autonomy: as long as there is fuel.

The generator plant takes over once batteries or flywheel have bridged the gap. We size it for the load, the start sequence and the run time the contingency plan requires – and test it under real load with load banks.
Ask about generator plants

mtu 20V4000 generatoranlæg

Emergency power systems

An emergency power system is the whole chain.

Mains, transfer switch, UPS, batteries, generator and distribution must work as one system. The weakest link sets the uptime – which is why we design, test and service the chain as a whole.

Ask about emergency power systems
MainsGeneratorTransferUPSBatteriesCritical loadNormal operationOn mains failure
MainsGeneratorTransferUPSBatteriesCritical load
PowerUP UPSystem 19″ rack

Fuel cells · PowerUP

POWER-UP UPSystem: 19″ rack backup on hydrogen.

UPSystem combines PowerUP’s UP3K fuel cells and batteries in a 19″ rack for indoor or outdoor use. On a power failure the batteries supply the load immediately, and the fuel cell takes over within seconds – with no CO₂ emissions on site.

  1. MillisecondsThe battery buffer supplies the load
  2. SecondsThe fuel cell starts and takes over
  3. Mains returnThe system switches off automatically
UPSystem 3KUPSystem 6K
Fuel cell generators1 × UP3K2 × UP3K
Nominal power3,000 W6,000 W
Peak load from inverter10 kW for max. 5 s10 kW for max. 5 s
Output48 V DC / 230 V AC / 400 V AC48 V DC / 230 V AC / 400 V AC
Battery bank (option)48 V, min. 100 Ah (5 kWh)48 V, min. 100 Ah (5 kWh)
Size (W × D × H)600 × 850 × 1700 mm600 × 850 × 2100 mm
Weight200 kg300 kg

Data: PowerUP Energy Technologies.

Compliance

Compliance and ISO 9001: the plant must be documented.

ISO 9001 requires controlled processes and traceability. For emergency power, this means every delivery, test and service visit must be verifiable – against the standards the plant was built and tested to.

Technical room in a data centre
  1. ISO 9001Quality managementControlled processes, traceability and continual improvement.
  2. DS/HD 60364Electrical installationsThe low-voltage installation the plant is connected to.
  3. DS/EN IEC 62040-3UPSPerformance and test methods for UPS systems.
  4. ISO 8528Generator setsGenerating sets driven by reciprocating engines.
Functional test of a UPS with a load bank

Commissioning

Proven in operation – before operations depend on it.

Commissioning documents that the plant works as designed: from the individual components to the whole system under load. Our partner Bluecircle carries out commissioning of data centres and critical installations.

  1. Level 2Pre-functional and component verification
  2. Level 3Functional and performance testing
  3. Level 4Integrated Systems Testing (IST)
Commissioning at Bluecircle
Norwerk service engineers

Service

A plant is only as good as the service behind it.

  • 24/7/365Emergency service – one phone number all year.
  • ≤ 4 hTo on site when it matters.
  • PlanPreventive maintenance finds faults before downtime.
  • LoadbankLoad testing documents the plant under real load.
Thermography of a UPS system

Thermography

Heat reveals the fault – before it becomes an outage.

A loose connection or an overloaded component heats up long before it fails. Thermography finds the fault while the plant is running. Our partner Bluecircle carries out thermography of switchboards and critical electrical infrastructure.

  • Switchboards and connections
  • UPS outputs and bypass
  • Emergency power batteries
Thermography at Bluecircle

Server room cleaning

Clean is measured, not seen.

Dust settles in filters, fans and cooling surfaces and makes components run hotter. Technical cleaning with particle measurement to ISO 14644-1 documents that the room is clean. Our partner Bluecircle cleans server rooms and data centres – also on subscription.

BEFOREAFTER
Illustration: airborne particles before and after technical cleaning.
Cleaning at Bluecircle
Technical server room cleaning

Do you have a project or a system that needs service?

Send us the load, required autonomy and voltage level – or describe the task. We will come back with a solution sized for your operation.

+45 50 53 13 17kontakt@norwerk.dkGet a quote

Safety is securing your energy