CLEANSOURCE® HD
Active Power (Piller) · Flywheel UPS

Active Power CLEANSOURCE® HD

CLEANSOURCE® HD is Active Power's highest power-density flywheel UPS. Active Power was acquired by Piller Power Systems in 2016 and is now part of the Piller group. It is the current version of the CleanSource HD Norwerk presented previously.

625 kW @ 380/400/415 V 50 Hzpower
Up to 5400 kWparallel
Up to 98 %efficiency
Up to 2 minutes (load dependent)ride-through
  • Data centres with limited space
  • Healthcare (OSHPD seismic approval in the US)
  • Sites with a genset where a few minutes of ride-through is enough
Price on requestRange: 625 kW (50 Hz) / 675 kW (60 Hz), up to 5400 kW

Technical data

ManufacturerActive Power (Piller)
TypeFlywheel UPS
Power625 kW @ 380/400/415 V 50 Hz
ParallelUp to 5400 kW
EfficiencyUp to 98 %
Ride-throughUp to 2 minutes (load dependent)
AmbientUp to 40 °C
Service life20-year design life, no battery changes

Source: www.activepower.com; www.activepower.com.

Technology

How it works

Active Power's parallel online architecture provides good isolation between input and output and delivers a clean sine wave. The manufacturer states protection against all nine IEEE power disturbance types.

The integrated flywheel takes less than half the space of a battery-based system, and the energy is sufficient for diesel starting and synchronisation – also with paralleled gensets.

675 kW (60 Hz) building blocks can be paralleled up to 5400 kW.

CLEANSOURCE® HD

Application

Where it fits

  • Data centres with limited space
  • Healthcare (OSHPD seismic approval in the US)
  • Sites with a genset where a few minutes of ride-through is enough

Versions and options

  • CSView software with over 200 telemetry points
  • BMS integration via Modbus TCP or SNMP
  • Dual input and integrated maintenance bypass
CLEANSOURCE® HD

Service

Operation and maintenance

Active Power specifies a routine annual check-up and a bearing change every third year – and no battery replacements during the 20-year flywheel life.

A rotary plant should always be load-tested at commissioning – stepped load, utility failures and transfer to engine.

Load bank test

Other models from Piller

Read more at Bluecircle

Norwerk’s partner Bluecircle has in-depth pages on the topic.

Do you have a project or a system that needs service?

Send us the load, required autonomy and voltage level – or describe the task. We will come back with a solution sized for your operation.