UNIBLOCK™ UBT+
Piller · Rotary UPS

Piller UNIBLOCK™ UBT+

UNIBLOCK™ UBT+ is Piller's rotary UPS without a built-in diesel engine. It is used where UPS and standby generator should be separate – for example to choose the engine supplier freely, reuse existing gensets or service UPS and engine independently.

500–2700 kWpower
Up to 40 MWparallel
Up to 97 %efficiency
Battery or POWERBRIDGE™energy store
  • Projects with existing or freely chosen gensets
  • Co-generation and gas-engine plants
  • Isolated parallel (IP bus) architecture
Price on requestRange: 500–2700 kW per machine

Technical data

ManufacturerPiller
TypeRotary UPS
Power500–2700 kW
ParallelUp to 40 MW
EfficiencyUp to 97 %
Energy storeBattery or POWERBRIDGE™
VoltageLow and medium voltage
CoolingAir or chilled water

Source: www.piller.com; www.piller.com.

Technology

How it works

The same UNIBLOCK™ motor-generator and coupling choke as in the UBTD+ provide filtering, voltage regulation and fault current. During an outage the energy store – battery or POWERBRIDGE™ – feeds the machine until the generator plant has taken over.

In its brochure Piller calculates a 2 MW data centre with 5 × 500 kW (N+1) and an actual load of 900 kW: efficiency rises from 94.6 % to 96.2 % and losses fall by 140,000 kWh a year. The figures are Piller's own and depend on the actual loading.

UNIBLOCK™ UBT+

Application

Where it fits

  • Projects with existing or freely chosen gensets
  • Co-generation and gas-engine plants
  • Isolated parallel (IP bus) architecture
  • Medium-voltage plants

Versions and options

  • DeRUPS™ integration of external gensets into the UPS controls
  • Containerised and water-cooled versions
  • Short or long bridging with batteries
UNIBLOCK™ UBT+

Service

Operation and maintenance

No power capacitors and usually no electric fans – the machine's own impeller provides cooling. That reduces the number of wear parts replaced at fixed intervals.

A rotary plant should always be load-tested at commissioning – stepped load, utility failures and transfer to engine.

Load bank test

Other models from Piller

Read more at Bluecircle

Norwerk’s partner Bluecircle has in-depth pages on the topic.

Do you have a project or a system that needs service?

Send us the load, required autonomy and voltage level – or describe the task. We will come back with a solution sized for your operation.

+45 50 53 13 17kontakt@norwerk.dkGet a quote